CUSTOMISED SERVICES
Manufacturing
Installation
Maintenance
Tamping
FLEXIBLE SOLUTIONS
Immediate Response
Minimal Lead Times
Flexibility
OPTIMISING BUDGETS
Pre Site Survey
Identifying Your Needs
Offering Alternatives
   
Home



IMMEDIATE RESPONSE

A.L.A.’s normal working schedules are much faster
than standard industry response times. For example,
we produced a set of ‘B’ Switches overnight when a
failure occurred with a full set of ‘A’ Switches.

We were also able to manufacture and install within a
24 hour period a newly fabricated 1:7 Crossing with extended Vee legs, using rail and fittings from our extensive stock.

Our efficiency was also demonstrated when we were fortunate enough to be awarded a job requiring the urgent curving of 25 no. 18m lengths of new Flat
Bottom 113A rail. This was achieved in a three day
turn-around from enquiry to despatch.

The difference is ... speed




Fax: +44 (0)1639 899842 | Email: sales@ala-rail.com
Byass Works, Dock Road, Port Talbot, SA13 1RS (Download map pdf)