PROBLEM:
Four days prior to a major contract handover, the client discovered that a key turnout
to the project was deemed unserviceable.

A.L.A. SOLUTION:
Upon site inspection, it was found that the general condition of the turnout was good. However, the switches were in very poor condition, and were old ‘A’ type heel switches which are no longer recommended for use.

A.L.A. upgraded the turnout by manufacturing a new set of ‘B’ switches in-house from
serviceable rail overnight at the client’s approval. Our installation team installed them the following day with no delay to the programme.


The Difference - was Speed as a result of In-House Manufacture.